Discription of The China Spallation Neutron Source Industrial Model
【Project introduction】The China Spallation Neutron Source (CSNS) is the first pulsed neutron source facility in developing countries. Thus it is expected to have positive effects in promoting the development of fundamental sciences and technology.
CSNS locates at Dalang Town of Dongguan City, the heart of the Guangdong-Hong Kong- Macao Greater Bay Area. It includes a powerful linear accelerator, a rapid circling synchrotron, a target station, and three Phase I neutron instruments. It aims to provide a powerful platform for both fundamental scientific research and high-tech development in many application fields such as material science, life science, resource environment, new energy, etc.
【Tendering & bidding process】This project is a permanent sand table model placed in the exhibition hall of the Dongguan Exhibition Center. The team of QZY MODELS, which usually only accepts customized projects, showed extremely professional advantages during the bidding section. We provided two schemes for model design, an additional exhibition hall transformation scheme, and a well-made physical sample. The general project effect won the unanimous approval of the judges, then finally stood out among the five participating units and won the bid.
【Production process】After entering the formal production stage, we had a final communication with our customer, and the customer added the requirement of the LED screen and multimedia video production with 150 thousand yuan saved from our design scheme.
In addition to the main model made in our workshop, the production of the on-site booth is also an important part of this project. After partially dismantling the original booth, we carried out a series of work on the site, including measurement, fabrication, and installation.
The total production period of the whole project is 6 weeks, of which the production of the main model lasted 5 weeks, the reconstruction of the on-site exhibition hall construction lasted 2 weeks, and the production of LED screens and multimedia content took 3 weeks.